GOAL:

Replace toe drain at the Hoist Dam.

The toe drain at the base of the earthen dam on the Dead River in Michigan's upper peninsula needed to be replaced. Soils surrounding the site were saturated and the existing drains no longer functioned adequately. Zenith Tech was selected to complete the work. Old Watertown dam

CHALLENGE:

Overcome the phenomenon called 'liquefaction'.

Replacement of the drains required sheeting. The vibratory hammer initially used caused the soils to become 'quick' and lose all support value. The event occurs when soil pressure is equalized by water pressure. Water would erupt from the earth. New Powerhouse

SOLUTION:

Control the condition and finish the work.

Zenith Tech engineers changed the pile hammer type, revised the equipment layout, finished the sheeting and replaced the drains.

New Spillway
HOME About Us Job Shots Project Sheets Links
Copyright - 2002
Zenith Tech, Inc.
All Rights Reserved.
Your browser needs JAVA to run this applet!
Zenith Tech, Incorporated
N6 W23633 Bluemound Road, Waukesha, WI 53187 Ph. 262.524.1800 Fax 262.524.1840
700 Eagle Nest Blvd. Suite C Rothschild, WI 54474 Ph. 715.241.6299 Fax 715.241.6610
email: ztiinfo@zenithtechinc.com