SAND-UNLOADING FACILITY Zenith Tech, Inc. - click for email.

GOAL:

Creat a cost-effective sand-unloading facility.

To product the highest quality asphalt products at competitive market prices, Payne & Dolan, Inc. developed this sand-unloading facility in cooperation with Zenith Tech, Inc. and the Wisconsin Central Railroad (WCL). Analyses showed that it was more cost effective to have manufactured sand delivered to its Waukesha asphalt plant by train than it was to truck the material. Old Watertown dam

CHALLENGE:

Facility must accommodate train-delivered sand.

The manufactured sand is drop unloaded from hopper cars into the grated area between the rails. The sand then is conveyed from the hopper by belt and elevated to be deposited for use in production of several Payne & Dolan premium asphalt mixes. New Powerhouse

SOLUTION:

Hoppers, tracks and conveyer belts transport sand to strategic spots throughout the plant site.

The project represents the cooperative efforts of Payne & Dolan, Zenith Tech, and WCL. It is an example of what can be achieved in a design-build environment when the goals and scope of the work are understood and the benefits are mutual.

New Spillway

 

HOME About Us Job Shots Project Sheets Links
Copyright - 2002
Zenith Tech, Inc.
All Rights Reserved.
Your browser needs JAVA to run this applet!
Zenith Tech, Incorporated
N6 W23633 Bluemound Road, Waukesha, WI 53187 Ph. 262.524.1800 Fax 262.524.1840
700 Eagle Nest Blvd. Suite C Rothschild, WI 54474 Ph. 715.241.6299 Fax 715.241.6610
email: ztiinfo@zenithtechinc.com